Construction

Concrete Column Calculator

Volume and bags of concrete for round columns or tube footings.

Parameters Live Compute
Calculated Output
Concrete volume 0.256
Concrete volume 6.912
80 lb bags (bags) 12
Formula: volume = π × (diameter/2)² × height × quantity
Step-by-Step Breakdown
1. Values used:
2. Diameter = 12
3. Height = 8
4. Number of columns = 1
5. Waste = 10 %
6.
7. Concrete volume = 0.256
8. Concrete volume = 6.912
9. 80 lb bags = 12bags
Did this calculator solve your problem today?
Report issue to loopingon.com
Sponsored

Find the concrete needed to fill round columns, piers or cardboard tube forms (Sonotubes).

The math behind it

A column is a cylinder: volume = π × radius² × height. The diameter (inches) is halved and converted to feet.

Multiply by the number of columns and add waste; convert to cubic yards (÷27) or bags.

Worked Example

One 12 in × 8 ft column → π × 0.5² × 8 = 6.28 ft³ (≈11 × 80 lb bags with waste).

Frequently Asked Questions

What is a Sonotube?

A waxed cardboard tube used as a one-time form to pour round concrete columns and footings.

Advertisement